01 · Optus

Sixty percent of the towers

A config change took out about 60% of Optus mobile towers. Full service in 40 minutes, with a 40-engineer shift.

Pencil sketch of mobile towers, many of them down.

40 minNational restore

A configuration change was rolling across the mobile network and towers were dropping with it. This was not a suburb and it was not a single cluster. Roughly 60 percent of the national tower estate was affected, which means customers losing service in more than one state at the same time. I was the incident controller on a 24x7 shift of about forty engineers, and the first job was to make that room one command instead of forty parallel conversations.

The working theory was the change itself. On a night like that, the dangerous move is a second fix written while the first one is still propagating. I froze further change, put radio, core, the person who had pushed the config, field and the vendor on one bridge, and split the floor so each engineer had a region, an alarm queue, or the rollback — not a general invitation to narrate.

The restore path was a rollback of that configuration onto the affected population, watched region by region as alarms cleared. Full service was back in forty minutes. I did not call it restored because one site went green. We waited until the alarm rate had returned toward baseline and a real customer path worked.

The forty minutes is the part people remember. The part that matters the week after is the control: that class of change could no longer leave on one pair of hands. The bridge ends. The peer check stays.

How I ran it

The order of decisions, written out so the clock is visible.

  1. 01

    I declared it a major as soon as the pattern was national, not regional. Naming the incident commander out loud stopped the floor from hunting for one while towers kept falling.

  2. 02

    Everyone who could change the outcome was on one bridge: radio, core, the engineer who had pushed the configuration, field, and the vendor. Side conversations were pulled in. A second call is how you get two restore plans.

  3. 03

    Further change was frozen. The theory was the configuration that had just gone out. Nobody was allowed to ship a compensating fix until we knew what had been pushed, to which population, and at what time.

  4. 04

    Forty engineers is a crowd unless the work is divided. Each person had a slice — a region, an alarm queue, or the rollback itself. I kept the clock and the sentence for executives. They kept the technical work.

  5. 05

    The executive update was one sentence: the share of towers down, what the customer could see, and the time of the next update. There was no root-cause speech while the rollback was still running.

  6. 06

    We rolled the configuration back across the affected population and watched alarms clear region by region. A single healthy site was not enough to say the country was back.

  7. 07

    Restored meant evidence. The alarm rate had to move back toward baseline, a sample of sites had to hold, and a customer path had to complete. That check is what the forty minutes includes.

  8. 08

    The bridge stayed up long enough to see whether the fault rebounded. The review the next day was specific: who had been able to push that change alone, and what peer check would stop the next one.